01 · The C3 EIQ
Protection and measurement
Lands at the main gear, clamps every surge at the service, and reads the whole facility on its revenue-grade meter.
C3 EIQ AutoSensing Energy Intelligence
One factory-built system at your main switchgear. It protects every circuit behind the service, corrects the power your facility draws, and shows the result on its own door.
Illustration with sample readings. Every value reads through the door window and on your own dashboard.
Meet the C3 EIQ
The C3 EIQ lands at the main gear as one complete system: correction, filtering, protection and measurement in one enclosure, installed and commissioned as a unit. Everything the facility needs to see is on the door.
The C3 EIQ.
Inside the C3 EIQ.
The complete system
C3 supplies the C3 EIQ, the correction bank and the filter reactor where it is applied, and commissions them together at the main gear as one complete system.
01 · The C3 EIQ
Lands at the main gear, clamps every surge at the service, and reads the whole facility on its revenue-grade meter.
02 · The correction bank
Sized on the facility's peak reactive requirement to hold 0.98. AutoSensing banks step their stages in and out as the load moves through the day.
03 · The filter reactor
Applied when the system audit recommends it. Where it is applied, it tunes the correction bank clear of the facility's harmonics and adds to the distortion reduction every C3 EIQ delivers.
Three reasons facilities call
Energy dollars on the bill, longer life and capacity in the equipment, and an end to the events on the floor. One machine at the service entrance delivers all three.
Power events
A blip reads as scrap on the line, a process restarted, a drive or control board replaced early, and a shift spent bringing the facility back. The C3 EIQ clamps every event at the main in four modes, counts it, and shows the count through the door window.
Under a millionthof a second to clamp, on seven protection paths on every phase
Energy savings
Correction at the main takes reactive current out of the utility transformer, the service conductors and the meter. Less current means less heat and less loss, and billed demand comes down with it.
8 to 12 percenttypical savings on the energy bill, calculated on your facility's own record
Equipment life and capacity
Heat is what ages a motor winding, a transformer, a drive and a termination. Less current through every conductor means less heat in all of it, so the equipment reaches its full rated life and the capacity the reactive current was holding comes back at the service.
15 to 25 percenttypically less heat in conductors, transformers and switchgear
The savings, the equipment life and the protection, delivered by one factory-built system at one connection and recorded on the door. The protection stage, the bus, the correction and the metering are designed together and built to one design on every C3 EIQ.
Where it lands
The C3 EIQ lands at the service entrance, on the main switchboard or switchgear fed from the utility transformer, ahead of the distribution. Every amp your facility receives passes that point, so one system conditions the whole service and everything it feeds.
Your facility
Choose the facility closest to yours.
The protection stage
A single lightning flash is 2 to 20 separate strokes. Seven fused paths per phase conduct together, so the C3 EIQ carries the whole flash and stays in service through it. The path count is the same on a 400 ampere service and a 3,000 ampere service.
| Equipment class | Rated withstand | C3 EIQ delivers | Margin |
|---|---|---|---|
| I, electronics | 1,500 V | 1,122 V | 25% |
| II, equipment | 2,500 V | 1,122 V | 55% |
| III, distribution | 4,000 V | 1,122 V | 72% |
| IV, service entrance | 6,000 V | 1,122 V | 81% |
Voltage delivered at the C3 EIQ bus bar on an ANSI/IEEE C62.41.2 Category C, 10 kA 8/20 microsecond event. Rated impulse withstand per IEC 60664-1, 150 to 300 volts to earth, covering 208Y/120 and 480Y/277 services. Type 2 SPD, UL 1449 5th Edition Listed.
AutoSensing
The controller senses the reactive requirement interval by interval and calls the stages that hold the design point as your load moves through the day, the week and the season.
Your bill
The efficiency factor is the power factor measured at your service, and it is the first number C3 looks at. Enter the demand figures from one utility bill to see where your facility stands against the 0.98 design point.
Filled with example figures. Replace them with the figures from your bill.
Efficiency factor on this bill
Your service carries reactive current the C3 EIQ supplies at the gear. Send this bill with the questionnaire and C3 computes the result on your full record.
Basis: efficiency factor = kW ÷ kVA. Correction = kVAR less kW × tan(acos 0.98). Current and loss follow from carrying the same kW at 0.98, with loss moving on the square of current. One billing period gives a first read. C3 sizes every system on the peak reactive requirement from the metered system audit.
Every event, on the door
The meter is built into the C3 EIQ and powered from its own bus, reading the whole service through sensors at the main. The result becomes a number you can confirm, and every value is on the door.
How it happens
You complete the questionnaire. C3 does every step after it.
Your facility and your billing, in one form.
C3 sets a power monitor on your main gear and records the full operating cycle.
Every candidate size modeled across your own metered record.
The selected system and its result, computed on your numbers.
Bench-built, bench-tested, then commissioned at your gear.
Reported from the C3 EIQ's own meter, the record you hold.
Built, listed and covered
C3 project sites
Three sites C3 has served, by company and plant. The written statements came from the facilities directly.
Johnson Controls · Largo, Florida
New LED lighting was failing in barrels, and replacement cost ran every month. The facility brought C3 in before committing capital to infrastructure work.
Failures and replacement cost went to zero, verified by plant management and the corporate office.
Owens Corning · Kansas City, Kansas
Every Monday at 6 AM, as the industrial district came up to load, a voltage event cost six hours of resets, waste and cleanup.
Line 1 was corrected first and its Monday events stopped while the other lines carried on. Line 2 followed.
Dura-Line · Mountain Grove, Missouri
Storm-driven blips, flicker, swells and sags meant scrap and restarts on the extrusion lines, so the plant shut down ahead of weather.
The weather-driven events were eliminated, validated by plant management and the company's US corporate office.
References are shared on request. Call 833-NO-BLIPS.
Start here
It covers the facility and the billing information. We run the energy audit, take the readings at your gear, and compute the result on your own numbers.