C3 EIQ AutoSensing Energy Intelligence

The bill drops.The blips stop.

One factory-built system at your main switchgear. It protects every circuit behind the service, corrects the power your facility draws, and shows the result on its own door.

  • Typically 8 to 12 percent off the energy bill
  • Resilience and uptime, with blips, surges, spikes, swells and sags clamped at the service entrance
  • Cooler equipment that reaches its full rated life
  • Every value on a revenue-grade meter your facility reads itself, 24/7/365
C3 EIQ · MAIN SWITCHBOARDSYSTEM NORMAL
EFFICIENCY FACTOR0.98
LIVE · 24/7/365
kW482.7
kVAR98.0
VOLTS478
AMPS601
THD %4.2
kWh1,284,506
ALL MODULES PROTECTING
SURGE EVENTS0042

Illustration with sample readings. Every value reads through the door window and on your own dashboard.

Meet the C3 EIQ

One factory-built system, read from the door

The C3 EIQ lands at the main gear as one complete system: correction, filtering, protection and measurement in one enclosure, installed and commissioned as a unit. Everything the facility needs to see is on the door.

The C3 EIQ, door closed: meter, protection window, pilot light, nameplate and handle12345

The C3 EIQ.

  1. Revenue-grade meterEfficiency factor, kW, kVAR, amps and distortion for the whole service, live, read through sensors at the main.
  2. Protection windowPer-phase status for A, B and C, and a counter that logs every surge the C3 EIQ clamps at the gear.
  3. Pilot lightSystem normal, at a glance, from across the room.
  4. Door handle and captive hardwareHinged steel door, opened in one motion with nothing to remove, every wearing item serviced from the front.
  5. NameplateBuilt in a UL 508A registered shop, marked and rated on its own nameplate, assembled in the USA.
Inside the C3 EIQ, door open1234567

Inside the C3 EIQ.

Inside the C3 EIQ

  1. Three-phase copper busA, B and C, carrying the incoming phases to every stage inside the C3 EIQ.
  2. Neutral barThe C3 EIQ's own neutral connection, kept separate from ground.
  3. The C3 EIQ protection stageClamps surges, spikes and swells at the service and drives the protection window and event counter on the door.
  4. BreakerOvercurrent protection for the circuits inside the C3 EIQ.
  5. FusingCurrent-limiting fuse protection inside the C3 EIQ.
  6. Control and meteringPhase monitoring, control power and the terminals that feed the meter on the door.
  7. Ground barEquipment grounding for the enclosure and every device inside it.

The complete system

Three assemblies, one system, one install

C3 supplies the C3 EIQ, the correction bank and the filter reactor where it is applied, and commissions them together at the main gear as one complete system.

The C3 EIQ enclosure

01 · The C3 EIQ

Protection and measurement

Lands at the main gear, clamps every surge at the service, and reads the whole facility on its revenue-grade meter.

An AutoSensing correction bank at the gear

02 · The correction bank

AutoSensing or fixed correction

Sized on the facility's peak reactive requirement to hold 0.98. AutoSensing banks step their stages in and out as the load moves through the day.

A filter reactor cabinet
RENDERING

03 · The filter reactor

Applied as required

Applied when the system audit recommends it. Where it is applied, it tunes the correction bank clear of the facility's harmonics and adds to the distortion reduction every C3 EIQ delivers.

Three reasons facilities call

The bill, the equipment, and the blips. One system.

Energy dollars on the bill, longer life and capacity in the equipment, and an end to the events on the floor. One machine at the service entrance delivers all three.

Power events

An event shows up on the floor

A blip reads as scrap on the line, a process restarted, a drive or control board replaced early, and a shift spent bringing the facility back. The C3 EIQ clamps every event at the main in four modes, counts it, and shows the count through the door window.

Under a millionthof a second to clamp, on seven protection paths on every phase

  • 300 kA of MOV surge protection per phase at the main
  • Voltage bolstered at the bus so lines ride through short sags
  • Every event counted, time-stamped and held by the facility

Energy savings

The savings show on the bill

Correction at the main takes reactive current out of the utility transformer, the service conductors and the meter. Less current means less heat and less loss, and billed demand comes down with it.

8 to 12 percenttypical savings on the energy bill, calculated on your facility's own record

  • Billed demand comes down with the current
  • Efficiency factor held at the 0.98 design point as the load moves
  • Heavy-duty capacitor cells built for a twenty-five-year life

Equipment life and capacity

The equipment runs cooler and lasts

Heat is what ages a motor winding, a transformer, a drive and a termination. Less current through every conductor means less heat in all of it, so the equipment reaches its full rated life and the capacity the reactive current was holding comes back at the service.

15 to 25 percenttypically less heat in conductors, transformers and switchgear

  • Motors, drives, boards and lighting reach their full rated life
  • Capacity returned at the transformer and switchgear
  • Value on the capital and maintenance budget, beyond the energy line
ONE SYSTEM
PATENT PENDING

The savings, the equipment life and the protection, delivered by one factory-built system at one connection and recorded on the door. The protection stage, the bus, the correction and the metering are designed together and built to one design on every C3 EIQ.

Where it lands

One connection, at the main switchgear

The C3 EIQ lands at the service entrance, on the main switchboard or switchgear fed from the utility transformer, ahead of the distribution. Every amp your facility receives passes that point, so one system conditions the whole service and everything it feeds.

  1. 1
    Utility transformerThe service arrives here, and reactive current now stops at the gear instead of riding back to it.
  2. C3
    Main switchboard or switchgear, with the C3 EIQShunt-connected, parallel to the bus and clear of the path of the load, on its own disconnect.
  3. 2
    Distribution and panelsFed from a bus the C3 EIQ holds higher and protects.
  4. 3
    Every load the service feedsDrives, motors, controls, lighting, IT and process equipment, all behind one point of protection.
01CorrectionHeavy-duty capacitor cells, switched by AutoSensing or held as a fixed stage, supply reactive power at the gear.
02Detuned filter reactorsApplied as required, when the system audit recommends it, sized to the service and tuned to impact the dominant harmonic orders.
03Return pathA neutral sized to the unit, on its own insulated factory bus, bundled with its ground back to the main.
04Protection300 kA per phase of MOV protection on seven fused paths per phase, each with its own thermal disconnect.
05MeasurementA revenue-grade Class 0.2 meter in the door, reading the whole service through sensors at the main.

Your facility

What the C3 EIQ changes where you work

Choose the facility closest to yours.

The protection stage

300 kA per phase. 1,122 V at the bus.

A single lightning flash is 2 to 20 separate strokes. Seven fused paths per phase conduct together, so the C3 EIQ carries the whole flash and stays in service through it. The path count is the same on a 400 ampere service and a 3,000 ampere service.

7redundant paths per phase, each with its own fuse and thermal disconnect
<5 nsresponse, conducting on the rising front of the event
4 modesline to line, line to neutral, line to ground and neutral to ground
Lifetimereplacement of the protection modules at no charge
Equipment classRated withstandC3 EIQ deliversMargin
I, electronics1,500 V1,122 V25%
II, equipment2,500 V1,122 V55%
III, distribution4,000 V1,122 V72%
IV, service entrance6,000 V1,122 V81%

Voltage delivered at the C3 EIQ bus bar on an ANSI/IEEE C62.41.2 Category C, 10 kA 8/20 microsecond event. Rated impulse withstand per IEC 60664-1, 150 to 300 volts to earth, covering 208Y/120 and 480Y/277 services. Type 2 SPD, UL 1449 5th Edition Listed.

Surges and spikesClamped at the main with EMI and RFI filtering, 1,122 V delivered at the bus.
Utility capacitor switchingThe correction branch meets the ring as an inductive path where the reactors are applied, and it arrives damped.
SwellsVaristors rated 346 V on a 277 V system carry the protection stage through a long-duration swell.
Sags and flickerThe bus stands higher, and motor reacceleration is supplied at the gear.
Neutral to groundClamped at the bus at 120 kA, over the bundled neutral and ground return.

AutoSensing

It reads your load and holds 0.98

The controller senses the reactive requirement interval by interval and calls the stages that hold the design point as your load moves through the day, the week and the season.

It rotates the cell groupsAn hour on 1 2 3 4, then 5 6 7 8, then 1 3 5 7, so wear spreads across every cell and each one reaches its full life.
Sized on your peakC3 sizes the bank from the peak reactive requirement in your own metered record, so it is present at the step that sets billed demand.
Generator readyA transfer switch contact releases the bank when the generator takes load and re-enables it on return. Protection, return path and metering stay in circuit through the run.
AUTOSENSING · CELL ROTATIONHOUR 1
Group in service: 1 2 3 4Holding 0.98

Your bill

Read your efficiency factor from one bill

The efficiency factor is the power factor measured at your service, and it is the first number C3 looks at. Enter the demand figures from one utility bill to see where your facility stands against the 0.98 design point.

The peak kW for the billing period
Often listed beside kW on the demand line

Filled with example figures. Replace them with the figures from your bill.

Efficiency factor on this bill

0.900Room to gain
0.700.800.900.98 design point
Reactive power on this bill315 kVAR
Reactive power at 0.98 for the same kW132 kVAR
Correction at this demand183 kVAR
Less current at 0.98, same kW8.2 percent
Less resistive loss at 0.9815.7 percent

Your service carries reactive current the C3 EIQ supplies at the gear. Send this bill with the questionnaire and C3 computes the result on your full record.

Basis: efficiency factor = kW ÷ kVA. Correction = kVAR less kW × tan(acos 0.98). Current and loss follow from carrying the same kW at 0.98, with loss moving on the square of current. One billing period gives a first read. C3 sizes every system on the peak reactive requirement from the metered system audit.

Every event, on the door

Your facility holds the record

The meter is built into the C3 EIQ and powered from its own bus, reading the whole service through sensors at the main. The result becomes a number you can confirm, and every value is on the door.

On the doorEfficiency factor, kW, kVAR, volts, amps, THD and energy, beside the phase status and the surge event counter in the window.
On your networkRead it on any browser on the facility network, or through Modbus or BACnet into your own BMS or SCADA dashboard.
On the recordEvery event time-stamped, every interval logged, 24/7/365, for measurement and verification from the system's own meter.

How it happens

From one questionnaire to a measured result

You complete the questionnaire. C3 does every step after it.

  1. Questionnaire

    Your facility and your billing, in one form.

  2. System audit

    C3 sets a power monitor on your main gear and records the full operating cycle.

  3. C3 SIMIQ

    Every candidate size modeled across your own metered record.

  4. Proposal

    The selected system and its result, computed on your numbers.

  5. Build and install

    Bench-built, bench-tested, then commissioned at your gear.

  6. Measured result

    Reported from the C3 EIQ's own meter, the record you hold.

Built, listed and covered

Built in America. Covered for the long run.

UL 508A listedThe C3 EIQ is a UL 508A listed industrial control panel, built to our own drawing, approved across 240, 480 and 600 volts. Bench-built and bench-tested in Texas, with the terminations and torque schedule set the same on every unit.
Made in the United StatesDesigned, built and assembled in the United States, with every component listed by a nationally recognized testing laboratory.
Federal terms metBuy American Act, Build America Buy America, Trade Agreements Act and DFARS, in every configuration, with a package letter against the named project.
Serviced from the frontEvery wearing item is reached with the door open, and a protection module changes in minutes.
Lifetimereplacement of the protection modules at no charge
25 yearsproduct life, serviced in place
24/7/365record of the whole service, from day one
One systemcorrection, filtering, return path, protection and measurement, commissioned together

C3 project sites

Facilities that stopped living with events

Three sites C3 has served, by company and plant. The written statements came from the facilities directly.

Johnson Controls · Largo, Florida

Lighting failures went to zero

New LED lighting was failing in barrels, and replacement cost ran every month. The facility brought C3 in before committing capital to infrastructure work.

Failures and replacement cost went to zero, verified by plant management and the corporate office.

Owens Corning · Kansas City, Kansas

The Monday morning blip ended

Every Monday at 6 AM, as the industrial district came up to load, a voltage event cost six hours of resets, waste and cleanup.

Line 1 was corrected first and its Monday events stopped while the other lines carried on. Line 2 followed.

Dura-Line · Mountain Grove, Missouri

The plant stopped watching the sky

Storm-driven blips, flicker, swells and sags meant scrap and restarts on the extrusion lines, so the plant shut down ahead of weather.

The weather-driven events were eliminated, validated by plant management and the company's US corporate office.

References are shared on request. Call 833-NO-BLIPS.

Start here

Start with our questionnaire

It covers the facility and the billing information. We run the energy audit, take the readings at your gear, and compute the result on your own numbers.

Call 833-NO-BLIPS. Complete the C3 EIQ facility questionnaire online, and send it with twelve months of utility bills.